The short answer

Most metal buildings we quote in Colorado run $12–18 per square foot as a kit and $32–45 installed. Where your lot sits matters as much as the size: elevation, snow load and wind code change the price lot by lot. Our instant quote prices your exact address.

$12–18Per sq ft, kit delivered
$32–45Per sq ft, installed
Lot by lotLoads change with
elevation

01

Size and footprint

Square footage sets the starting point. Bigger buildings cost more in total and usually less per square foot.

Nathaniel White, co-founderPlan the inside, then pick the size
Read transcript

Recording and transcript coming soon.

Every building has two end walls, four corners and a set of doors no matter how long it is. On a small garage those parts are a big share of the price. On a 40×80 they’re spread across far more floor.

Width matters more than length. A wider building needs deeper frames to span the gap without posts, so going from 30 to 40 ft wide adds more than going from 40 to 50 ft long.

Start with what has to fit inside: trucks, a lift, a camper, a bench along one wall. Then size the building around it.

Size guides and layouts

02

Codes, snow and wind loads

Your address decides how strong the building has to be. In Colorado that moves the price more than anything except size.

Elijah White, co-founderWhy your neighbor’s price isn’t yours
Read transcript

Recording and transcript coming soon.

Every county adopts a building code with a ground snow load and a design wind speed. Higher numbers mean heavier frames, tighter frame spacing and more purlins. The building looks the same from the road. There’s more steel in it.

Colorado is hard to generalize. Elevation climbs fast and loads climb with it. Two lots in the same county, a few miles apart and a thousand feet higher, can need different frames. Open sites east of the Front Range see more wind; mountain towns see more snow.

That’s why we don’t publish a price by size alone. A 30×40 in Grand Junction and a 30×40 near Leadville are different buildings on paper.

Relative snow and wind loads for the same 30×40 building in different Colorado towns
Same 30×40, different townElevationSnow loadWind
Grand JunctionMesa County4,580 ft 1 out of 5, relative load 2 out of 5, relative load
MontroseMontrose County5,810 ft 2 out of 5, relative load 2 out of 5, relative load
Colorado SpringsEl Paso County6,040 ft 2 out of 5, relative load 4 out of 5, relative load
Castle RockDouglas County6,220 ft 3 out of 5, relative load 3 out of 5, relative load
GunnisonGunnison County7,700 ft 4 out of 5, relative load 2 out of 5, relative load
LeadvilleLake County10,150 ft 5 out of 5, relative load 3 out of 5, relative load

Relative loads, sample data. Your county sets the exact numbers for your lot.

Grand Junction and Western Slope

03

Kit or installed

A kit is the steel, plans and delivery. Installed adds the concrete, the crew and the doors. It’s the biggest price choice you control.

Elijah White, co-founderWhat a kit buyer should line up first
Read transcript

Recording and transcript coming soon.

With a kit you hire the concrete and assembly yourself, or do them. It suits owners who have built before, have a crew, or have the time.

With done-for-you, get connected with Whitestar-vetted independent crews for concrete, erection, and garage doors. You get one price and one person to call.

Installed prices vary most at the slab. Slope, frost depth, truck access and how far the site is from town all count.

Kit

  • 26-gauge US steel, frames and trim
  • Stamped plans for your county’s loads
  • Delivery in 2–6 weeks, included
  • You arrange concrete
  • You arrange assembly and doors
Metal building kits

Done for you

  • Everything in the kit
  • Concrete slab and footings
  • Building assembly
  • Garage doors installed
  • One price, one contact
How done-for-you works
How done-for-you works

04

Long and narrow costs more

Two buildings with the same floor area can price differently. A long, narrow one often costs more than a squarer one.

Nathaniel White, co-founderWhy we sometimes suggest a wider building
Read transcript

Recording and transcript coming soon.

A 20×60 and a 30×40 both have 1,200 sq ft of floor. The 20×60 has 160 ft of wall to the 30×40’s 140, plus more frame lines down its length. More wall means more panels, trim and labor.

If your lot forces a narrow shape, that’s fine; we design plenty of them. If it doesn’t, a squarer footprint gets you the same floor for less.

30×40 · 1,200 sq ft140 ft of wallFewer frame lines, wider span
20×60 · 1,200 sq ft160 ft of wallMore wall, trim and frames for the same floor
See 30×40 layouts

05

Wainscot, trim and finishes

Wainscot is the band of a second color along the bottom of the walls. It looks sharp, and it usually costs extra.

Elijah White, co-founderWhere wainscot is worth it
Read transcript

Recording and transcript coming soon.

Wainscot adds a second run of panels, a trim line between them and more cutting on site. In steel it also protects the lower wall from dings and gravel.

Other finishes work the same way: a vertical roof, extra trim colors, gutters and downspouts. Each is small. Together they add up.

If the budget is tight, a single wall color with contrasting trim gets most of the look.

photo: shop, single wall color
Single color, contrasting trim
photo: shop with 3 ft wainscot
3 ft wainscot in a second color
Colors and materials

06

Before you budget, call
your building office

The fastest way to a real number is one phone call to your county or city building department.

Nathaniel White, co-founderWhat to ask, word for word
Read transcript

Recording and transcript coming soon.

They’ll tell you the snow load, wind speed and setbacks for your lot, whether you need a permit and how long it takes. Those answers shape every quote you get, ours included.

Write the numbers down. When you compare quotes, check that each one was engineered to them. A cheap quote built to the wrong load isn’t a real price.

Questions for your building office

  1. What is the ground snow load for my address?

    Sets frame size and spacing.

  2. What design wind speed and exposure do you use?

    Open sites on the plains often need more bracing.

  3. What are my setbacks?

    Decides how big the footprint can be.

  4. What frost depth do footings need?

    Changes the concrete, not the steel.

  5. Do I need a permit, and how long does it take?

    Most Colorado counties require one for a building this size.

  6. Do you need engineer-stamped plans?

    Ours include them for your county’s loads.

Permits and plans

07

What it costs per month

Financing can cover the whole project: the building, the slab and the assembly.

Body: how financing works with us, who it suits, and how it compares to rent-to-own and paying cash.

$50,000

Up to 120% financing from 7.8% APR over 20 years. No hard credit check, same-day answer. Powered by HFS.

$412per month, estimatedSee if you qualify

Colorado cost questions

How much does a metal building cost in Colorado?
Most metal buildings we quote in Colorado run $12–18 per square foot as a kit and $32–45 installed. Where your lot sits matters as much as the size: elevation, snow load and wind code change the price lot by lot. Our instant quote prices your exact address.
Why do prices vary so much across Colorado?
Elevation climbs fast and loads climb with it. Two lots in the same county, a few miles apart and a thousand feet higher, can need different frames. Open sites east of the Front Range see more wind; mountain towns see more snow.
What snow load do I need in my county?
The fastest way to a real number is one phone call to your county or city building department. They’ll tell you the snow load, wind speed and setbacks for your lot, whether you need a permit and how long it takes.
Is delivery included?
A kit is the steel, plans and delivery. Delivery in 2–6 weeks, included.
Do I need a permit for a metal building in Colorado?
Most Colorado counties require one for a building this size. Call your county or city building department to confirm whether you need a permit and how long it takes.
Can I finance the concrete and assembly too?
Financing can cover the whole project: the building, the slab and the assembly.
Is a metal building cheaper than a wood pole barn?
When you compare quotes, check that each one was engineered to the snow load and wind speed for your lot. Compare the same scope: the building, plans, delivery, concrete and assembly.

See your price
in 2 minutes

Enter your size and see a real price with delivery included. No obligation, and no sales call unless you ask for one.

  • 100% US-made galvanized cold-formed steel
  • Delivery in 2–6 weeks included
  • Family-owned in Colorado
Rather talk? (970) 649-4483

Start with a FREE,
no obligation quote

Stamped plans and 2-6 week delivery included.

What are the dimensions of your metal building?

Metal building width diagram

Step 1 of 4About 2 minutes

27×40×12 shop, Grand Junction, CO